How to run more effective retrospectives with TeamRhythm

Contents
This is some text inside of a div block.
This is some text inside of a div block.
This is some text inside of a div block.
Subscribe to our newsletter

If you have been running retrospectives for some time prior to 2020, you may be familiar with the follow agenda for a 1 hour session:

Time allocated - Activity (before)

It is quite possible that as your team transitioned to working remotely from 2020 onwards, that retrospectives were still run in realtime but in a virtual setting using Zoom/Teams/Meet rather than in person.

Here at Easy Agile where we have flexible work arrangements, most team members usually spend 1-2 days a week in the office, though we now also have team members working interstate who are 100% work from home. As a result, all our teams really value their F2F meeting time whether it be in person or virtual, so we try to maximise that F2F time as much as we can for those important debates and conversations where the entire team can listen and participate in real time.

How Easy Agile uses TeamRhythm retrospectives to maximise team time

1. Team members can add items to the retrospective board anytime during the sprint

The team is reminded and encouraged to add items to the retrospective board at any time during the sprint, whenever it is top of mind. This can be done asynchronously without any time constraints. Items added like this tend to be worded better because it has not been rushed within the timebox of a traditional retro setting. Capturing the item when it’s top of mind ensures that these items are less likely to be forgotten when the team sits down together to run the retro at the end of the sprint.

2. The team self reviews the retro board during the sprint

The team can review the items on the retro board during the sprint and ping the author of a particular item if they are unclear as to the content of the item. With this feedback and over time, Easy Agile teams have learnt to write in a more specific manner where the item is less likely to be incorrectly understood.

3. Facilitators categorize items before the meeting

Grouping and sorting retro items during the meeting itself can often be a rushed and sometimes stressful event, especially if it is left to just the facilitator to do it while running the meeting at the same time. At Easy Agile, the nominated retro facilitator looks at the items of the board ahead of time and uses categories to label and group like-minded items together.

4. Face to face time are primarily for debate and action setting

Easy Agile retrospective meetings now mainly focus on reviewing and discussing those retrospective items already pre-labelled into specific categories, and deciding on what actions need to be taken in order to improve on future sprints.

The timing of a retrospective at Easy Agile now typically looks like this:

Time allocated - Activity (after)

Wrapping it up

By encouraging the team to capture any lessons/thoughts they would like to share during the course of a sprint by capturing it as soon as it comes up on that sprint’s retro board, the majority of the time spent during the retrospective meeting at the close of a sprint focuses on meaningful conversations, ideation, candid feedback and debates and more thoughtful actions.
Less time is wasted with the team sitting silently trying to recall what worked or didn't work during the last two weeks and then having to type it out quickly and have it make sense to the rest of the team.

Just one more thing…

By the time you read this, we will have provided users with the ability to add items to a retrospective board directly from the Jira issue viewer, so now the friction to add a retrospective item is reduced by one less step.

And we also plan to provide the option to display any outstanding retrospective actions from previous sprints on the current retro board.

How do you and your teams run retros? Do you have any tips that you would like to share with us? We would love to learn from you as well. Please email us at hello@easyagile.com with subject: Retro tips.

Easy Agile TeamRhythm
Improve team collaboration and delivery

Related Articles

  • Agile Best Practice

    The Ultimate Guide to Agile Retrospectives

    You’ve come to the end of your sprint. Your team planned and prioritized the most important tasks and executed them as well as possible. It’s just almost time to begin planning again, and jump into the next sprint...

    BUT — there’s a critical step you've overlooked.  The team retrospective meeting.  

    What went well? What didn’t go well? What do you need to improve upon for next time?

    We built this guide based on years of agile training and software development experience. Our ultimate guide to retrospectives has everything you need to run effective retrospective meetings, including the benefits of retrospectives, how to run them well, and extra resources.

    An intro: what is agile?

    But first, a review of agile. If you’re already familiar, feel free to skip ahead to the next section on retrospectives.

    One of our favorite ways to differentiate the agile methodology from traditional, waterfall project management is to compare the approaches to jazz vs. classical music.

    In classical music, a conductor brings a piece of music to an orchestra. The conductor guides the group through the piece, dictating exactly what happens where and when based on their own previously decided ideas. It’s a lot like traditional project management. A project manager creates a plan, brings it to their team, and tells them how to carry it out. Each step plays out as it was designed to, under the careful observation of the project leader.

    Now, consider jazz music. Jazz is collaborative, with each bandmate feeding off of each other in a flexible environment. The band doesn’t go in completely blind. Everyone is working off of a piece of music — but it’s not strictly adhered to, allowing for new directions to be discovered in the moment. The band, just like an agile team, works together to create music flexibly and iteratively, with each iteration a little different — and hopefully even better — than the last.

    💡 Learn more: Agile 101: A Beginner's Guide to Agile Methodology

    Traditional project management isn’t flexible. Instead, team members must work in a sequential order that’s dictated by the original plan and project manager. Think of an assembly line. The same steps are followed from project to project. The linear structure means that if one piece of a project stalls, the entire project stalls.

    Agile, on the other hand, is non-linear. It focuses on collaboration between team members, flexibility, and delivering consistent value to stakeholders throughout the development process. Each new iteration yields actionable insights about what’s working and what isn’t. This multidimensional way of working eliminates the bottlenecks and dependencies that are common with traditional project management.

    What is a retrospective?

    Retrospectives are a staple of many agile processes. They can be a critical moment for teams to come together and provide feedback about how processes can improve. Retrospectives keep the agile process — well — agile and encourage continuous improvement. No matter how well the last sprint went, there is always something that can be improved upon for the next iteration.

    Agile retrospectives help agile teams gather data and feedback from those involved in the Scrum process. In Scrum, a retrospective is held at the end of every sprint, which is generally every two weeks. The retrospective is a chance for all team members to share what went well, what didn’t, and what could be improved upon for next time. The insights are taken into account in the next planning session to ensure teams learn from their mistakes, successes, and each other.

    How retrospectives fit with Scrum

    Retrospectives are conducted in a variety of agile methodologies, but for the purposes of our Retrospectives Guide, we’re going to discuss retrospectives within the Scrum process. It’s one of four critical meetings used in Scrum, coming at the conclusion of each sprint. So, how are retrospective meetings utilized in Scrum?

    Scrum artifacts

    Artifacts are the pieces of work the team completes over the course of the sprint. The product backlog is a compilation of tasks that the team believes need to get done in order to complete a product or iteration of a product. The product backlog is large and not very refined.

    Items from the product backlog get moved into the sprint backlog when it’s time for them to be completed. The sprint backlog represents everything the team hopes to accomplish over one sprint, which generally lasts for two weeks. The sprint backlog is more refined — it focuses on the current state of the product, stakeholder feedback, and customer needs.

    Scrum roles

    There are three Scrum roles, and each has different duties within the Scrum framework. The product owner prioritizes the work that needs to be completed over the course of each sprint. They refine and prioritize backlog items, moving the necessary product backlog items into the sprint backlog.

    The next role is the Scrum Master, who guides the team during the two week sprint, ensuring the Scrum framework is adhered to. This person is an expert in all things Scrum and can act as a facilitator during daily stand-ups and other important meetings. The Scrum Master tends to play a key role in leading retrospectives.

    Lastly comes the development team. They make up the bulk of the team and complete the work set out in the sprint backlog. The development team participates in planning, attends daily stand-up meetings, and delivers work to the client and stakeholders.

    Stakeholders and customers, while not directly on the Scrum team, play important roles in the Scrum process. Stakeholder and customer needs must always be at the forefront of development decisions. Stakeholders should be brought in early and often to provide critical feedback as a product is being developed.

    Scrum ceremonies

    The Scrum ceremonies are the events that take place within the Scrum framework. First comes sprint planning to set the stage, then daily Scrums or standup meetings, followed by a sprint review and a sprint retrospective.

    The sprint planning meeting is when everything gets set up for the next sprint. Sprint planning meetings are opportunities to prioritize backlog items and get the entire team aligned on their goals for the upcoming two weeks. Without planning, the team won’t have clear goals, and they won’t know what tasks to tackle next.

    The daily stand-up, sometimes called a daily Scrum, occurs every day of the sprint. The entire team participates in this daily meeting that updates everyone involved in the sprint. During the meeting, team members update each other on what they accomplished over the past 24 hours and what they hope to accomplish over the next 24 hours. This time also serves as an opportunity to discuss any issues that occurred or potential roadblocks that could prevent work from moving forward smoothly.

    The sprint review meeting happens at the end of the sprint and is an opportunity to discuss the success of the sprint based on what tasks are considered “Done.” The sprint review can also bring stakeholders into the Scrum process to ensure everyone still aligns on where the product is going and what should happen next. Stakeholders provide invaluable insights that ensure the team stays on track to meet customer needs.

    The last ceremony in the Scrum framework is the shining star in our guide. The sprint retrospective meeting arrives at the end of every sprint. It’s a critical meeting that helps the team improve from one sprint to the next. It allows team members to share what went well, what didn’t go so well, and what could be improved upon for next time.

    We’ll dissect the elements of a good sprint retrospective throughout the rest of this guide.

    💡 Learn more about the differences between these four meetings in our article: Agile Ceremonies: Your Guide to the Four Stages.

    The benefits of retrospectives

    Retrospectives put the iterative in agile. They provide a focused time for teams to learn from the past and each other so they can constantly improve the development process. Retrospective benefits are vast, and they trickle down into all areas of development. The insights from a retrospective can improve productivity, team dynamics, team trust, customer value, and the overall Scrum process.

    Retrospective benefits include:

    • Documenting feedback in real-time after each sprint
    • Exposing issues from the previous sprint that are holding the product or team back
    • Aligning the team around the most important issues
    • Giving everyone involved an opportunity to express ideas, thoughts, and experiences
    • Informing leadership of potential roadblocks
    • Bringing the team together around common goals and action items
    • Establishing a safe space for sharing positive and constructive feedback
    • Encouraging a continuous improvement mindset
    • Helping product owners make decisions for the next sprint
    • Setting the team on a positive path for the next sprint

    6 Effective retrospective techniques

    Now that you know why retrospectives are so important to the agile process, it’s time to dig into how to run them effectively. Use our 7 retrospective techniques for a smooth meeting that keeps everyone engaged and always results in quality insights.

    1. Choose a time that works for everyone and stick to it

    It’s important that every member of the Scrum team participates in the retrospective. This means holding it when everyone is available, whether that’s in-person or virtually.

    Get feedback from your team about the best time to set this meeting. It should take place right after the sprint ends but before the planning meeting for the next sprint. This can be a tight window, which is why it helps to schedule this meeting at the same time every two weeks.

    Consistent meeting times help ensure the meeting actually happens and that an optimal number of team members can attend.

    2. Find new and creative ways to acquire feedback

    The Start, Stop, Continue format can take many forms, but the general process is the same. The team discusses what they want to start doing, what they want to stop doing, and what they want to continue doing in the next sprint. It’s a simple framework that addresses both what went well with the previous sprint and what could be improved for next time.

    This is a tried and true method, but it’s also important to change up your format and ask different questions to keep the team engaged.

    You are trying to acquire similar information each time (what to start, stop, and continue), but the way you gather that information can change and evolve. Add variety to your Scrum retrospective and mix things up every once in a while to keep everyone engaged.

    Find new ways of asking similar questions, and bring in new ice-breakers that help the team feel comfortable discussing the past two weeks with honesty and clarity.

    Other versions of “Start, Stop, Continue” include the Rose, Bud, Thorn exercise, where team members discuss something positive about the experience, a “budding” opportunity that can be expanded on for next time, and something negative about the experience that should be improved upon. Another alternative is the Anchors and Sails exercise. What about the last sprint weighed or anchored the team down, and what positives put wind in their sails, so to speak?

    Boring retrospectives will make team members dread the meeting and will lower participation significantly. If participants aren’t engaged, they won’t contribute as openly, and they won't take ownership over the process.

    Mixing things up is also a good way to uncover insights the team hasn’t considered before. New questions will spark new ideas, issues, and solutions that otherwise would not have been discovered.

    3. Ensure all voices are heard

    All voices need to be heard in the retrospective. It’s the responsibility of the meeting facilitators to make sure everyone has a chance to speak during the meeting and that loud or dominant personalities don't overtake the conversation. They have to be heard too, but not at the expense of more introverted team members.

    If you notice some members of your team do not participate, start asking them direct questions. If this only makes them retreat further into their shell, take them aside at the end of the meeting for a one-on-one conversation. How can you make the meeting environment more comfortable for them? What will best enable them to collaborate effectively? Ensure this is framed in the right way so it doesn't sound like they're in trouble but rather like you value and appreciate their input.

    4. Establish a comfortable environment

    Ensure the retrospective feels safe and comfortable for everyone involved by instilling trust, collaboration, and open dialogue. Each team member should feel like their voice is important. It should be a place of positivity, not a chance for team members to dunk on one another. It’s up to the facilitator to ensure everyone is comfortable.

    There should be room for everyone to speak. The whole team should feel like they can express their thoughts and opinions about what happened over the course of the sprint. If people feel uncomfortable or think their voice won't be appreciated or heard, they will hold back and not actually express their honest feedback.

    This is detrimental to the process, as it can leave recurring issues to fester and worsen over the course of future sprints. It is in everyone’s best interest to be open and honest and to hear everyone out. The goal of a retrospective is to solve issues, prevent roadblocks, and improve the team’s processes. If team members are silent or dishonest about how they feel things are going, nothing will be solved.

    Comfort plays a big role in how honest everyone will be. Ensure everyone is respectful and that speaking time is shared across the team. Take time building trust and allowing the team to get to know each other. A team that trusts one another can work together and build each other up — and you’ll be able to manage issues before they begin to hinder productivity, team wellness, or the Scrum process.

    5. Document everything and create clear action items

    If you don’t document it, it didn’t happen. Don’t rely on memory alone after the retrospective. Document the feedback team members provide, and ensure any important ideas or issues are brought to the next planning meeting.

    Turn important insights into action items to make sure ideas are not lost. Ensure action items are specific and clear and that the whole team understands what “done” actually means for each task. Once an action item is created, make sure there is follow-up, ideally at the beginning of the next retrospective. Determine who is responsible for the action item and how important it is in the grand scheme of your product backlog.

    6. Review your action items at the next retrospective

    So, you’ve collected your and your team’s insights and made those insights into action items. The final step is addressing those action items during the next retrospective. Were they resolved, or did the same issues keep occurring?

    It’s best practice to review your previous retrospective action items at the beginning of the next retro. Did the team make progress on the task? What else needs to happen? Do you need to follow up again at the next retrospective meeting?

    What happens after the retrospective?

    The retrospective may be the last meeting of the sprint, but it doesn't end there. Take those insights into the next sprint.

    After the retrospective, the product owner reevaluates the product backlog and chooses what will go into the sprint backlog for the next round of work. They should consider past mistakes, successes, stakeholder feedback, and retrospective insights as they make decisions.

    The sprint planning meeting comes after the retrospective and will help the team regroup and align on what they need to accomplish next. With each sprint, you will gain more information about the product, your customers, how the team works together, and your overall process. These lessons are taken into account to make improvements from sprint to sprint and product to product.

    For better sprints, read our sprint planning guide, which includes everything you need to run efficient and effective planning meetings. ➡️ The Ultimate Agile Sprint Planning Guide.

    Turn an action item into a Jira issue in just a few clicks, then schedule the work to ensure your ideas aren’t lost at the end of the retrospective.

    Use Easy Agile TeamRhythm

    LEARN MORE

    Retrospective mistakes to avoid

    Collecting feedback may sound simple, but there are many ways a retrospective can go wrong — from overpowering team members to asking repetitive questions to failing to capture insights effectively. Read our list of common retrospective mistakes to make sure your team doesn’t drop the ball.

    ❌ Skipping or delaying the retrospective

    Due to a lack of time or resources, teams may consider skipping the retrospective. This is a costly mistake.

    Do not, under any circumstances, skip a sprint retrospective. This is a critical time when the team has a chance to improve their processes. Skipping a retrospective enables the status quo and encourages complacency. The agile process is about continuous improvement — without the retrospective, you lose a critical opportunity to learn about the strengths and weaknesses of your team and its processes.

    Delaying the retrospective can also be detrimental to your progress as a Scrum team. It’s important that you gather insights right after the sprint ends — while the ideas and issues are still fresh.

    Delaying the retro could result in team members forgetting how the process actually went, leading to bland feedback that lacks the kind of detail that can create positive changes. And if delayed too long, something else could come up that takes priority over the retrospective, meaning the meeting may never occur at all.

    ❌ Always asking the same questions

    The Scrum process is repetitive by nature, but that doesn’t mean your retrospectives should be boring or unbearably dry. Sticking to the status quo is a huge mistake in retrospectives.

    When you repeat the same meeting every two weeks, you need to add variety in order to keep the team engaged. As soon as you lose team attention, engagement will drop, and the quality of the feedback you receive will too.

    When running a retrospective, check in with yourself and the team to make sure engagement and interest stay high. If you are losing people’s attention and find engagement is dropping, change your format or the types of questions to keep everyone awake, attentive, and on their toes. Switching up who facilitates the meeting is another way to add variety into the mix.

    ❌ Allowing some of the group to dominate the conversation

    Every voice on the team needs to be heard, but sometimes it’s the loudest ones that come through, well, the loudest. 📢 Effective retrospectives require multiple perspectives to deliver fresh insights.

    Don’t let a select few voices dominate the conversation. A domineering team member will use all of the meeting’s time and limit the insights you can gather. If every voice isn’t heard, problems with the process could persist throughout multiple future sprints, severely impacting the effectiveness of your team. Plus, those who aren’t as loud will feel less involved and undervalued.

    ❌ Failing to empower softer voices

    Along with discouraging domineering behavior, you need to amplify the softer voices.

    Some people will be less likely to engage, or they may be too shy or afraid to express their opinions in a group setting. Watch out for this. If you notice it, find ways to make those underheard voices heard. It could mean asking them questions directly during the meeting, or it could mean taking a shy team member aside after the meeting to collect insights one-on-one.

    If they find the group or your process intimidating, make the necessary adjustments to ensure everyone feels comfortable expressing their thoughts about the sprint. A retrospective is a collaborative process. Do what you can to engage and empower every member of the team.

    ❌ Jumping to conclusions without discussion

    A single statement from one team member isn’t the end of the conversation. When team members bring up issues or ideas, they need to be discussed as a team. Do others feel the same way? Is it critical that this idea be implemented immediately, or can it be put on the back burner for now? How does a particular insight impact the product or customer needs specifically?

    Don't jump to conclusions without having a meaningful discussion. You can gather information from your team quickly without throwing off your set meeting timeline. Don’t let any one topic throw you off course, but ensure you aren’t overlooking anything. If the team agrees an idea has merit, turn it into an action item that can be followed up on at the next retrospective meeting.

    ❌ Not implementing insights into the next sprint

    Unfortunately, this is quite common. A team holds a retrospective meeting and does almost everything right only to fail to thoroughly record their team’s insights and put them into practice.

    The whole point of the retrospective is to help your team improve. If you don’t properly document the feedback you receive from the team and don’t put those insights into action, you’re not getting the most from your retrospectives.

    Turn feedback and discussion topics into clear action items you can follow up on later. Take important action items and insights into your sprint planning meeting and check in at your next retrospective. Were you able to make progress on the previous retrospective’s action items? What roadblocks did you hit? Do the action items require any further attention or follow-up?

    ❌ Not improving your retrospective process

    Even a retrospective could use a retrospective! 🤯

    Every now and again, take time to review your retrospective process. Ask your team to provide feedback on how they think the meetings are going. What do they like, what do they not like, and how do they think the retrospective meetings could improve?

    You can improve on each aspect of your agile process. Go straight to the source to gather the opinions of those involved in the meeting. Do team members feel heard? Have issues been addressed to their satisfaction? Have the meetings grown stagnant?

    When it comes to improving your retrospectives, your team has the data. Do not hesitate to ask.

    Just because retrospectives come last in the Scrum process doesn’t mean they aren’t important. Don’t lose steam as you cross the finish line. Hold a retrospective at the end of every two-week sprint. Ensure each sprint retrospective includes insights from each team member and that insights are documented and transformed into clear action items.

    📚 Additional resources

    We have a wealth of free resources on the Easy Agile blog, and we continue to add to it every week. We recommend checking out our other guides as well as our top-performing agile content.

    Thanks for reading our ultimate retrospectives guide! 👏 If you have any questions about this guide, our other content, or Easy Agile products, reach out to our team. We love talking to teams and individuals about agile and how to work better together. We’ll continue to update this guide as we gain more retrospective insights, techniques, tools, and best practices.

    Using Easy Agile to improve your Agile process

    If your sprint retrospective isn’t effective, your next sprint will suffer from the same issues. It is imperative that Scrum teams gather at the end of each sprint to discuss what went well, what didn’t go so well, and what can be improved on for next time. Otherwise, you invite complacency and stagnation into your Scrum process — the antithesis of agile.

    Improve your Retrospectives with Easy Agile TeamRhythm. The Retrospective features in TeamRhythm help your team stay on the path of continuous improvement. Watch the highlights tour to see how Easy Agile TeamRhythm makes sprint planning, managing your backlog, and team retrospectives easier. Visit Atlassian Marketplace to start your free, 30-day trial today.

  • Workflow

    5 Steps to Holding Effective Sprint Retrospectives

    The retrospective is a critical part of the agile process, providing an outlet for teams to discuss how they can improve. A sprint retrospective comes at the end of each sprint and offers the team an opportunity to assess their processes.

    What went well? What didn’t go so well? What does the team need to do to improve next time? Agile is all about learning and iterating. Every time you complete a sprint, there are lessons to be learned. Agile continually takes what a team learns — the good, the bad, and the bland — and turns those experiences into actionable improvements.

    This post will dig into sprint retrospectives, including the benefits, how they fit within the Scrum process, how to run an effective sprint retrospective meeting, and common mistakes to avoid.

    The purpose of the sprint retrospective

    The sprint retrospective is a dedicated time for team discussion. The time is allotted at the end of each sprint so that all team members can examine what went well and what needs to change. It’s all part of the greater agile methodology of continually improving your processes as you learn more. There’s no one set way of doing things, and there’s always room to become more efficient and effective.

    A sprint retrospective:

    • Encourages a continuous improvement mindset
    • Creates a safe space for sharing positive and constructive feedback
    • Gives everyone on the team an opportunity to express thoughts, ideas, and experiences
    • Provides feedback in real-time after each sprint
    • Brings the team together around common goals
    • Exposes any issues from the previous sprint that are holding the team back
    • Informs leadership of success and potential roadblocks
    • Helps product owners make decisions for the next sprint planning
    • Sets the team on a positive path for moving into the next sprint

    How the sprint retrospective fits within the Scrum process

    The type of retrospective you hold depends on the type of sprint or agile methodology your team practices. One of the most common methodologies in software development is the Scrum framework.

    A Scrum team has three types of roles:

    • Product Owner
    • Scrum Master
    • Development team

    At the beginning of each Scrum, the product owner decides which items from the overall product backlog are moved to the sprint backlog to be completed over the upcoming 2-4 week sprint. The exact sprint timeframe is set in advance.

    The Scrum is made up of four distinct ceremonies or events:

    After planning is complete and the team knows which backlog items they are going to tackle for the current sprint, the work begins. The team checks in throughout the sprint via a daily scrum or stand-up meeting. This quick but essential check-in allows the Scrum team to discuss their progress and address any potential roadblocks on a daily basis.

    The sprint review meeting takes place at the end of the sprint; it’s an opportunity for Scrum team members to showcase the work accomplished during the sprint. This could be an internal presentation or a more formal demo to stakeholders.

    Last comes the incredibly important Scrum retrospective. During this time, the team can discuss what went well and what could be improved so the upcoming sprint can run more efficiently. Anything that’s learned along the way or discovered in the retrospective is brought into the next sprint planning session. This Scrum process repeats until there are no more product backlog items or the product is complete.

    How to run an effective sprint retrospective meeting

    The retrospective is a critical part of the agile process that should be treated with care and respect. Go in with a plan. Winging it might get you by, but everyone will get more out of the process if the person or people leading the retrospective is prepared.

    Use our strategies below to run effective retrospectives that everyone looks forward to.

    1. Ensure everyone’s voice is heard

    The loudest voices in a sprint retrospective often get the most attention and speaking time, but they don’t necessarily have better insights than anyone else. Each person involved in the sprint process should be given an opportunity to speak.

    If you find a few people are dominating the conversation or that some people never contribute, switch up your strategy to include everyone. Go around the room one by one with a question that each person needs to answer, such as “What do you think went well in this sprint?” or “What was your biggest challenge?”

    2. Start, stop, continue

    The 'Start, Stop, Continue' retrospective format can be expressed in many forms, but the general practice is the same. At the end of a sprint, you decide what you want to start doing, what you want to stop doing, and what you want to continue doing as you move into your next sprint. It’s a simple format that covers both what went well and what didn’t go so well.

    Other versions of this exercise include the Rose Bud Thorn exercise, where participants share something positive, a budding opportunity, and a negative to improve upon. There’s also the Anchors and Sails exercise, where participants share what put wind in their sails (went well) and what anchored them down.

    3. Establish specific action items

    The retrospective is a waste of time if you don’t leave with specific action items. What is your team going to do about the issues brought up in the meeting? Ensure you keep track of the issues and the positive feedback people provide so that you can turn them into actionable tasks or goals before the meeting is complete.

    You can’t implement absolutely every change that is brought up, but the discussion should give you a place to start. Work with the team to figure out what changes will provide the most impact. You can use an impact effort matrix or similar agile tools to make informed choices.

    4. Retrospective the retrospective

    Every now and again, take the time to review your retrospective. Ask for feedback from all team members on how the process could improve. What would make the experience easier on the team? What would they like to see implemented? What hasn’t been working during your recurring retros?

    Wow, that’s getting a little meta, but it’s an important step. You need to continually assess your retrospective as well to make sure you’re getting the most out of the experience.

    One thing to watch for: When people are bored, they engage less, which means it’s important to switch things up. You don’t want your retrospective process to run stagnant or lose its effectiveness.

    5. Review action items at the next sprint retrospective

    Make sure the hard work of your retrospective pays off. At the beginning of the next retrospective, take a small bit of time to review your previous action items. What goals and action items did you leave the last retrospective with? Did you accomplish what you set out to do, or do you still need to work at it?

    Common retrospective mistakes to avoid

    Avoid these common mistakes when running sprint retrospective meetings:

    ❌ Allowing a few people to dominate the conversation

    ❌ Not empowering softer voices

    ❌ Jumping to conclusions without a thorough discussion

    ❌ Asking the same questions over and over without mixing things up

    ❌ Forgetting about or not implementing the action items of the previous retrospective

    ❌ Skipping a retrospective due to lack of time or resources

    ❌ Forgetting about stakeholder and customer needs

    ❌ Failing to improve upon your retrospective process

    Put your retrospective ideas into action with Easy Agile TeamRhythm

    Sprint retrospectives help the entire team learn from each experience and improve. Doing them effectively means evaluating the retrospective itself, empowering voices, and listening to them.

    We’re passionate about putting the needs of the customer first and foremost. Easy Agile builds products specifically designed for Jira users to help agile teams work more efficiently and effectively.

    Easy Agile TeamRhythm supports the work of your agile team from planning right through to retrospective, encouraging continuous improvement so you're always getting better at what you do, and delivering better for your customers.

    TRY EASY AGILE TEAMRHYTHM FOR FREE

  • Workflow

    Sprint Retrospective Templates to Help Run Better Sprints

    Agile retrospectives are a time to reflect on the sprint before. During this time, the Scrum team decides on the agile retrospective template to use during retrospective meetings. A sprint retrospective template provides a structure for retrospective meetings. These retrospective templates guide agile teams in analyzing their previous sprint.

    What is an agile retrospective?

    Teams use agile retrospective meetings to improve the next sprint. As the team members move through the product life cycle, they gain new learning after each sprint retrospective, which they apply to the next sprint.

    The focus of the sprint retrospective meeting

    Sprint retrospective meetings ask four questions, as listed below. The agile team places these four questions in the four quadrants of their retrospective template. (Note: Team members can use a whiteboard or sticky notes to set up their meetings. Or they can use Jira software to facilitate remote team meetings in real-time.)

    Co-located agile teams can also use whiteboards and sticky notes to do an agile retro. But for remote teams, agile retrospective template software allows all team members to participate in sprint meetings.

    Here are the four question areas for discussion:

    • What went as planned?
    • Where could the team have made improvements?
    • What should team members do in the next sprint?
    • What confuses the team?

    1. What went as planned?

    The agile retrospective requires in-depth analysis. Team members can chat about what they enjoyed, which methodologies worked for them, and what agile ideas are worth taking into the next sprint.

    Typical questions that agile teams ask in this first stage include:

    • What were team members happy with?
    • What actions delivered positive results?
    • What processes or actions should the agile team continue with?
    • Should anyone receive a special thanks for their contribution?

    2. How could the team have improved?

    Stakeholders examine where they went wrong and try to find the root cause of the issues. Brainstorming involves what they could have tried previously, where improvements are needed, and what processes or actions they can test in the next sprint.

    Here are some ways to make this question more concrete:

    • What has the team previously not tried that might work?
    • What is one new thing that we could attempt?
    • What new tactics or actions can we test next?

    3. What should team members do in the next sprint?

    In this part of the template, the team explores new ideas for how to improve their follow-up approach. New ideas can be risky, so the Scrum team should carefully consider opportunities for improvement. The idea in this questioning phase is to clarify problem areas, where value was not produced, and what was puzzling in the previous sprint.

    In this round, the team should discuss:

    • What didn’t work?
    • What did the team do that did not produce value?
    • Which areas specifically require improvements?
    • What did not go as anticipated?
    • What issues in the previous sprint are confusing?

    4. What still confuses the team?

    In this section, the team should focus on areas that weren’t as effective or did not go as anticipated and what areas need improving. Other relevant areas include where the agile team didn’t deliver value, focus areas that require development, and what was confusing about the sprint.

    Here, it’s important to talk about:

    • What questions still remain unanswered?
    • What outcomes still require further investigation?
    • Is the team following processes that don’t deliver clear value?

    Through a process of iteration, the Scrum team brainstorm to come up with real-time solutions to take over to the next sprint. Using retrospective ideas, the team populates the four quadrants of the retro template, producing a visual representation of their post-mortem.

    Scrum teams can apply the four questions above in other retrospective templates or customize a template to conduct their post-mortems.

    Retrospective template options

    Team members can choose from retrospective templates to customize their sprint meetings.

    Sprint planning can benefit from any of the agile retrospective templates below:

    • The start, stop, continue template
    • The four Ls retrospective template
    • A starfish retrospective
    • Sailboat retrospective
    • Glad, sad, mad
    • Mad, sad, glad

    1. Start, stop, continue

    In the “start” part of this retro, the agile team looks at the actions they’ll take in the next sprint. “Stop” refers to looking at the recently completed sprint to examine what didn’t work and the actions that the team should no longer take. “Continue” means identifying what worked in the current sprint and should be taken over to the next cycle.

    2. Four Ls

    Agile teams use this retro template to understand what they “Loved, Learned, Loathed, and Longed for” at the end of the sprint iteration. The team calls out what they appreciate, what the sprint taught them, what went wrong, and what they would’ve wanted more of (coffee, team members, time, etc.).

    3. Starfish

    Instead of using a retro that focuses on what worked and what didn’t, the starfish highlights degrees of efficiency in deliverables. Teamwork involves rating action items as levels of effectiveness to determine what methodologies they should keep, discard, and apply in the next round.

    4. Sailboat

    Scrum teams use the sailboat retro to determine their trajectory in unknown waters. Applying the sailboat retro means knowing what approaches inhibit progress, what new approaches will reap desirable outcomes, and establishing a direction for sprint planning.

    5. Mad, sad, glad

    The mad, sad, glad sprint retrospective is a technique that concentrates on the emotional status of teams. Scrum teams ask each other questions to create positive emotional support. These questions are also aimed at morale-boosting to create a positive atmosphere that supports teamwork and continuous improvement.

    The agile retro can follow any template they choose or select one and customize it for their specific needs. Whatever they do, teamwork is vital to the success of continuous improvement.

    Decide on your retro template today

    Now that you understand how the sprint retrospective template works, you can customize yours for joint teamwork.

    Instead of focusing on longed-for outcomes and functionalities, Easy Agile can help your Scrum team move from sad to glad.

    Team retrospectives right inside Jira

    Looking to improve how your team is working together? Easy Agile TeamRhythm helps you turn insights into action with team retrospectives, to improve how you’re working and make your next release better than the last.

    TRY EASY AGILE TEAMRHYTHM FREE FOR 30 DAYS